As
an application of distributed photovoltaic systems facilities, the life cycle
can be reach to at least 25 years. And we can be divided into four production
phases: feasibility analysis phase, design and construction, and network and
the operational phase, maintenance phase. Each stage focus on how to efficient
operations, we have sorting out some of the following considerations and
suggestions for you:
Firstly,
the feasibility analysis stage
Investment and construction of solar power system, The first consideration is the
local light resources, because light resource rich or poor has determined the
power stations, at last it will affect investment. Most regions in China are
distributed photovoltaic installation, but in order to place consumptive,
reduce electricity transport, usually installed in industrial plants,
commercial buildings, agricultural facilities, municipal and other public
buildings, agricultural and pastoral areas and outlying island regions. For
distributed PV rooftop installation projects, we also need to focus on roof
load (Year of construction of houses, housing structure, housing the effective
use of space, roof orientation and azimuth, tilt angle, shelter, local
pressure, topography) , the strength
of electrical cable interference, noise (<65dB), insulation,
lightning, fire, mistakenly hit the set, electricity billing, distribution of
subsidies, rent roof property, facilities management and other legal risks.
Secondly,
Design and construction phases
According
to different circumstances in building owners and installation requirements, we
can design the most suitable distributed PV solutions, maximize investment
interests. For the already built building, you can choose to install an additional
type of small solar backup generator on the
roof; If it is the top end of the building,
or if you want to transform the roof of the building, you can consider the use
of building materials and photovoltaic products, and to achieve the combination
of architecture and photovoltaic. so that the building will more beautiful. For
the former, it saved the investment for the traditional building materials; if
roof positive towards sun, you can give priority to crystalline silicon PV
products. And if the roof south part is limited
and owner want to increase the use area. Except for the roof, awning on the
balcony, the ground is also shed viable form. In terms of construction, just
according to the PV industry standard construction, to make sure the cabling
specifications, reasonable layout.
Thirdly,
on-grid and operational phases
When
installation is complete, the owner can apply for on-grid in the power
operating organization, the power company will arrange someone to install the
meter, sign contract with the network user, and to make on-grid debug. The
power companies will install two meters for owners for free, it is a
measurement of photovoltaic electricity meters, and the other is a two-way
meter measurement, namely the owners own electricity and sell electricity
metering meter grid. So owners can see their real-time electricity consumption
per day, power generation and transmission of electricity to the grid
situation. Further, the government granted subsidies for PV, power companies
will be paid directly to the household income from electricity sales and all
levels of government subsidies.” "From
the on-grid application debugging, install metering devices, all the services
provided by these utilities are free." Senior people said.
At
last, the use and maintenance stage
In
the long term use of distribute solar power generator plant, it’s almost maintenance
free. But in the operation, with time passing by , it will gradually reduce the
system efficiency and reduce power generation. The owner may take some measures
to improve the efficiency of the power generation station. The routine
maintenance measures are as follows: check whether there are appearance defects
on the components or not, such as breakage, occlusion,
wire corrosion; a focus on clean solar power generation system, reducing
assembly time cleaning dust obscured shall use a soft cloth for cleaning,
strengthen equipment management to reduce the failure rate, based on a
reasonable replacement parts and other equipment aging period.
Distribute solar electric generator is a investment in
long-term benefits of the project, how to ensure the efficient operation of the
power station for at least 25 years time? During use time, we need to consider
all the details, the power generation efficiency can maximize the use of solar
energy resources. After retiring in PV power plants, we should looked from an
environment perspective, classify disposal station facilities, and to consult
with a qualified business recycling waste components, etc. always practice the
concept of “green, low carbon”
No comments: