What kind of functions did the inverter have in the solar power system



 What kind of functions did the inverter have in the solar power system
The inverter is an essential part of a PV system, the main function is to transfer the DC power in the battery panel into AC power that used by home appliances, so that to achieve an inverter function. But in addition to the inverter, what else did it carry?QQ图片20160111110057
1, MPPT function to ensure that maximize the output power
Solar panel’s current and voltage are changed according to the intensity of solar radiation and the solar cell module itself temperature, and therefore the power output will change too, in order to ensure the maximize of the output power, it is necessary to obtain the maximum possible output power of the solar panels. The inverter’s MPPT tracking function is designed for this feature, also called MPPT tracking maximum power point tracking, As estimates, the configuration of MPPT tracking system compared with the systems that not installed generating capacity MPPT tracking, the output power are higher 50%.
So ,if you wanna more of the PV systems electricity, do not just look at solar panels, how much electricity can be effectively output in the solar panel, it depend on the inverter.
2. anti-alone operation function, to protect the safety of the power grid.
When install the on and off grid solar power system, many people are holding the idea that” Even if the power outage, we can also use it” but they doesn’t know when the power outage, their home PV system will also stop functioning.
The reason for this phenomenon is the inverter have equipped with anti-islanding device, when the grid voltage is 0, the inverter will stop working. Let me explain to you, Anti-islanding device is a necessary means for all the grid-connected inverter. The main function is for the safety of it. Just imagine, when the power outage, power workers have been on the circuit for maintenance, while your home PV power system still continuously upload, it is easy to cause accidents.
If you really want use electricity when power outage, you can consider the off grid solar system,  then, usually the solar panels will store electricity, when you need it, it can be use at usual.
3.According to solar panel’s output power automatically operation and shutdown.
When the sun rise in the morning, the intensity of the solar radiation are increasing, when reaches the desired output power, the inverter start to operation. After operation, the inverter will always monitor the output of the solar cell module, as long as the required output power of the solar cell module output power is greater than the inverter operation, the inverter will continue to running; it will stop until sunset, even in the rainy days. When the solar cell module output became smaller, inverter output is closed to 0, the inverter will form a standby state.
It is visible that the inverter played a very important role in the whole run of the system, it’s an indispensable part. Known as the heart of the PV system.

Wednesday, October 19, 2016

What are the four stages of the distributed PV power plants?



As an application of distributed photovoltaic systems facilities, the life cycle can be reach to at least 25 years. And we can be divided into four production phases: feasibility analysis phase, design and construction, and network and the operational phase, maintenance phase. Each stage focus on how to efficient operations, we have sorting out some of the following considerations and suggestions for you:

Firstly, the feasibility analysis stage
 Investment and construction of solar power system, The first consideration is the local light resources, because light resource rich or poor has determined the power stations, at last it will affect investment. Most regions in China are distributed photovoltaic installation, but in order to place consumptive, reduce electricity transport, usually installed in industrial plants, commercial buildings, agricultural facilities, municipal and other public buildings, agricultural and pastoral areas and outlying island regions. For distributed PV rooftop installation projects, we also need to focus on roof load (Year of construction of houses, housing structure, housing the effective use of space, roof orientation and azimuth, tilt angle, shelter, local pressure, topography) , the strength of electrical cable interference, noise (<65dB), insulation, lightning, fire, mistakenly hit the set, electricity billing, distribution of subsidies, rent roof property, facilities management and other legal risks.
Secondly, Design and construction phases
According to different circumstances in building owners and installation requirements, we can design the most suitable distributed PV solutions, maximize investment interests. For the already built building, you can choose to install an additional type of small solar backup generator on the roof; If it is the top end of the building, or if you want to transform the roof of the building, you can consider the use of building materials and photovoltaic products, and to achieve the combination of architecture and photovoltaic. so that the building will more beautiful. For the former, it saved the investment for the traditional building materials; if roof positive towards sun, you can give priority to crystalline silicon PV products. And if the roof south part is limited and owner want to increase the use area. Except for the roof, awning on the balcony, the ground is also shed viable form. In terms of construction, just according to the PV industry standard construction, to make sure the cabling specifications,  reasonable layout.
Thirdly, on-grid and operational phases
When installation is complete, the owner can apply for on-grid in the power operating organization, the power company will arrange someone to install the meter, sign contract with the network user, and to make on-grid debug. The power companies will install two meters for owners for free, it is a measurement of photovoltaic electricity meters, and the other is a two-way meter measurement, namely the owners own electricity and sell electricity metering meter grid. So owners can see their real-time electricity consumption per day, power generation and transmission of electricity to the grid situation. Further, the government granted subsidies for PV, power companies will be paid directly to the household income from electricity sales and all levels of government subsidies.” "From the on-grid application debugging, install metering devices, all the services provided by these utilities are free." Senior people said.

At last, the use and maintenance stage
In the long term use of distribute solar power generator plant, it’s almost maintenance free. But in the operation, with time passing by , it will gradually reduce the system efficiency and reduce power generation. The owner may take some measures to improve the efficiency of the power generation station. The routine maintenance measures are as follows: check whether there are appearance defects on the components or not, such as breakage, occlusion, wire corrosion; a focus on clean solar power generation system, reducing assembly time cleaning dust obscured shall use a soft cloth for cleaning, strengthen equipment management to reduce the failure rate, based on a reasonable replacement parts and other equipment aging period.
Distribute solar electric generator is a investment in long-term benefits of the project, how to ensure the efficient operation of the power station for at least 25 years time? During use time, we need to consider all the details, the power generation efficiency can maximize the use of solar energy resources. After retiring in PV power plants, we should looked from an environment perspective, classify disposal station facilities, and to consult with a qualified business recycling waste components, etc. always practice the concept of “green, low carbon”